ADA Ramp Installation for Health Facility
Pacific NW Concrete successfully completed the installation of an ADA-compliant ramp at a health facility in Hillsboro, Oregon, ensuring accessibility for individuals with disabilities. The project involved thorough site preparation, including grading and excavation, to create a stable foundation for the ramp. The ramp was designed to meet all ADA requirements, with proper slope, width, and non-slip surfaces for safety and ease of use. High-quality concrete was poured and finished to provide a durable, long-lasting surface that can withstand heavy foot traffic. The completed ramp enhances the facility's accessibility, ensuring that all patients and visitors can safely enter and exit the building.
Completed
2024
Location
Hillsboro, OR
Project Type
Sidewalk
Concrete Style
Broom Finish
Time to Complete
4 Days