Apartment Complex Curb Installation
Apartment Complex Curb Installation & Replacement – Beaverton, Oregon
Pacific NW Concrete LLC provides professional curb installation and curb replacement services for apartment complexes, multifamily properties, and commercial developments throughout Beaverton, Oregon.
This project includes the removal and replacement of damaged, deteriorated, or non-compliant concrete curbing to improve property appearance, enhance pedestrian safety, and maintain proper traffic flow throughout the community. Our team will saw-cut existing concrete where necessary, remove and dispose of failed curb sections, prepare and compact the subgrade, install formwork, and place new high-strength concrete designed for long-term durability.
All new curbs will be constructed to meet applicable local standards and will be finished to provide a clean, uniform appearance that complements the existing property. Expansion joints and control joints will be installed as required to help minimize cracking and ensure proper performance over time.
New curb installations can be designed to improve vehicle circulation, parking lot organization, drainage management, and protection of landscaped areas. Upon completion, the site will be cleaned and restored, providing apartment residents and visitors with a safer and more attractive environment.
Scope of Work Includes:
Saw cutting and surface preparation
Excavation and subgrade preparation as required
Installation of forms and reinforcement where applicable
Placement of high-strength concrete
Control joint and expansion joint installation
Curb and gutter installation or replacement
ADA-compliant transitions where required
Site cleanup and debris removal
Final quality inspection
Location
Beaverton, OR
Completed
2026
Project Type
Curb Cut, Curb, Sidewalk
Concrete Style
Broom Finish
Time to Complete
4 Days
Project Details
Demolition and removal of damaged concrete curbs
Saw cutting and surface preparation
Excavation and subgrade preparation as required
Installation of forms and reinforcement where applicable
Placement of high-strength concrete
Control joint and expansion joint installation
Curb and gutter installation or replacement
ADA-compliant transitions where required
Site cleanup and debris removal
Final quality inspection