top of page

Exposed Aggregate Walkway

Exposed Aggregate Walkway Installation – Residential Property – Lake Oswego, Oregon

Pacific NW Concrete LLC will provide professional installation of a decorative exposed aggregate concrete walkway surrounding the residential property in Lake Oswego, Oregon. This project is designed to enhance curb appeal, improve accessibility around the home, and provide a durable, low-maintenance walking surface that complements the property's landscaping and architectural features.

The scope of work includes site preparation, excavation, grading, and compaction of the subgrade to establish a stable foundation for the new walkway system. Forms will be installed to create smooth transitions and consistent walkway dimensions while ensuring proper drainage away from the home's foundation.

Premium concrete will be placed and finished using an exposed aggregate process that reveals the natural beauty of decorative stone within the concrete surface. This finish provides an attractive, textured appearance while offering improved slip resistance compared to traditional smooth concrete finishes, making it an excellent choice for residential walkways.

Control joints will be strategically installed to help manage natural concrete movement and minimize cracking. Upon completion, the exposed aggregate surface will be professionally washed and treated to achieve a uniform decorative finish. A protective concrete sealer may also be applied to enhance appearance, improve stain resistance, and extend the lifespan of the walkway.

Scope of Work Includes:

  • Layout and project planning

  • Excavation and removal of unsuitable materials

  • Subgrade preparation and compaction

  • Installation of walkway forms

  • Placement of high-strength concrete

  • Decorative exposed aggregate finish

  • Control joint installation

  • Proper grading for drainage

  • Surface cleaning and finishing

  • Optional concrete sealing for long-term protection

  • Complete site cleanup upon completion

The finished walkway will provide a beautiful and durable pathway around the residence while increasing property value, improving functionality, and creating a timeless decorative feature that complements the natural surroundings of Lake Oswego.

Location

Completed

2026

Project Type

Walkway

Concrete Style

Exposed Aggregate

Time to Complete

4 Days

Project Details

  • Layout and project planning

  • Excavation and removal of existing walkway

  • Subgrade preparation and compaction

  • Installation of walkway forms

  • Pour Concrete 3500 PSI

  • Control joint installation

  • Proper grading for drainage

  • Surface cleaning and finishing

  • Exposed Aggregate Finish by applying acid solution to finished concrete

  • Optional concrete sealing for long-term protection

  • Complete site cleanup upon completion

Explore More Concrete Projects

bottom of page