Foundation Installation - Addition
Thickened Edge Foundation Installation – Portland, Oregon
This project involved the installation of a thickened edge concrete foundation for a new structure. The work included site preparation, excavation to the required depth, installation of a compacted crushed rock base, and placement of reinforcement in accordance with the project plans.
Forms were set to establish the foundation dimensions and thickened perimeter before concrete placement. After the concrete was poured and finished, control joints were installed where required, and the forms were removed following initial curing.
The completed foundation provides a stable, durable base designed to support the structure while meeting the project's specified requirements.
Location
Portland, OR
Completed
2026
Project Type
Foundation
Concrete Style
Broom Finish
Time to Complete
14 Days
Project Details
Thickened Edge Foundation Installation – Portland, Oregon
Scope of Work
Site layout and preparation
Excavation to the required depth and dimensions
Subgrade preparation and compaction
Installation and compaction of crushed rock base
Forming of the thickened edge foundation
Installation of reinforcing steel per approved plans
Coordination and completion of required footing and form inspections
Concrete placement, consolidation, and finishing
Form removal after initial curing
Site cleanup and preparation for the next phase of construction
Successfully passed all required footing, formwork, and final inspections
The completed thickened edge foundation provides a stable, durable base that meets project specifications and is ready for framing or the next stage of construction.